Taylor Logo

Manufacturing Glossary


A | B | C | D | E | F | G | H | I | J | K | L | M
N | O | P | Q | R | S | T | U | V | W | X | Y | Z
 

Acronyms | Concepts | Hardware | Software | Links

Manufacturing:Concept


Advanced Planning and Scheduling (APS)
Available Machine
Available-to-Promise (ATP)
Backward Scheduling
Batch
Bill Of Materials (BOM)
Bill-of-materials Explosion
Block
Bottleneck
Breakdown
Campaign Setup Block (CSB)
Capacity
Change Over
Cleanup
Component
Critical Resource
Cycle
Cycle Time
Delay
Downtime
Due Date
Earliest Start Date
Efficiency
Execution
Expedite
Finite Capacity Scheduling (FCS)
First Come First Served (FCFS)
First In First Out (FIFO)
Forward Scheduling
Holding Operation
Holiday
Idle Time
Incremental Scheduling
Inventory
Just In Time (JIT)
Labor
Lag
Lead Time
Learning Curve
Line
Load Chart
Machine Block
Machine Line
Machine Setup
Manufacturing Resource Planning (MRP II)
Master Production Schedule (MPS)
Material
Material Requirements Planning (MRP)
Maximum Delay
Model
Operation
Operation Lag
Operation Split
Operator
Optimization
Order
Order Attribute
Order Peg
Order Relations
Overlap
Overtime
Part
Part Attribute
Pattern
Plant Area
Plant Load
Production Line
Production Updates
Queue
Real-Time
Record
Resource
Resource Graph
Routing
Routing Sheet
Routing Variant
Run Rate
Saved Schedule
Schedule
Scheduling
Scheduling Rule
Sequence
Setup Time
Slack Time
Split
Standard Quantity
Start Date
Statistics
Status
Step
Throughput
Timeline
Tooling
Transfer Time
Trigger
Utilization
What-if Analysis
Work In Process (WIP)
Work Order
Yield